en
Home
|
News
|
SOLUTION Project
|
GIS
|
Lessons learnt
|
Documents
 | 
Intranet
>
Hvar
>
Presentation
>
GIS
-
Biomass production
-
Large scale solar PV installation
-
Small renewable production
-
Supply and demand
-
Energy efficiency in buildings
Biomass production
Heat production:
Energy (target):
300 MWh/year
-
Power (target):
100 KW
Energy (made):
0 MWh/year
-
Power (made):
0 KW
Electricity production:
Energy (target):
560 MWh/year
-
Power (target):
80 KW
Energy (made):
0 MWh/year
-
Power (made):
0 KW
Newsletter
The Solution project is supported by the
7th Framework Programme
of the
European Commission
through the
Concerto Initiative
.
copyright 2010 - 2012